I need a solution
Hi,
Customer is planning to upgrade their backup exec 12.5 to 2014 and to migrate to a new server.
Would you recommend to upgrade the backup exec first to current server then migrate to new server or to migrate first then perform upgrade?
Current Server:
Memory 12 GB
OS Microsoft Server Standard 2008 SP2
Processor : Intel Xeon X5550 @ 2.67 GHz 16 CPUs
New Server will be Win 2008 R2
Memory of 16GB
Library: HP MSL G3 Series
Drive: Ultrium 4-SCSI / Firmware version (H58W and H68W)
Do we need to replicate/migrate existing BE 12.5 to new server with the Library attached to new server?
Can we attach the library to new server after the migration?
Thanks!