Trying to setup backup to disk and duplicate to tape with GFS rotation. Can define a single backup with 3 backup jobs (Incremental, Weekly Full and Monthly Full) no problem. The problem is trying to setup duplicates. Can only have 1 duplicate stage that is allowed to select source, and choice is 1 backup job or all 3 jobs. Can create multiple stages, but subsequent stages duplicates the prior duplicate stage. Need to define 3 duplicates steps so each duplicate can be assigned to different Media Pools.
Incremental - to Increment tape pool for 21 day retention
Weekly - to weekly tape pool for 13 week retention
Monthly - to monthly tape pool for 36 month retention
Could define 3 completely separate backup jobs, but then would have 3 separate selection criteria. That is too error prone for a production system. Was easy with 2010, figure there must be an easy way in 15. Tried the manual but it wasn't any help.